What we do
Every service, by discipline, with the fee
Design, assessment, geotechnical and certification. Each line carries the code it is designed or assessed to, the timeframe, and the fee — a fixed fee where we can print one, a fee scale on the value of the works where the job is a design. If what you need is not here, ask; we will tell you honestly when it is a job for a different discipline.
Structural
- Structural design for a new building to the NBCJ and BS EN codes 2–6 weeks Fee scale on the works Fee
- Structural assessment of an existing building survey + calculation 1–2 weeks J$85,000 Fee
- Retrofit and strengthening design to the NBCJ by project Project-priced Fee
Civil
- Site and drainage design to the approving-agency standard 2–4 weeks Fee scale on the works Fee
- Roads and external works to the relevant road standard by project Project-priced Fee
- Subdivision and infrastructure design to NWC / agency standards by project Project-priced Fee
Geotechnical
- Foundation investigation and recommendation boreholes subcontracted, our interpretation 2–3 weeks On the number of boreholes Fee
- Slope and retaining assessment stability analysis 1–2 weeks J$95,000 Fee
Inspection
- Structural certificate for a mortgage or insurer inspection + certificate 3–5 days J$45,000 Fee
- Forensic investigation of a crack or a failure investigation by project Project-priced Fee
- Site supervision and stage certification periodic inspection through the build By retainer Fee