Geotechnical
Slope and retaining assessment
Designed tostability analysis
Timeframe1–2 weeks
FeeJ$95,000
Signed byA registered engineer
For a cut, a fill or a hillside site: whether the slope is stable as it is, what could move it, and the retaining structure it needs to be safe. On this island, on these hills, it is the assessment that is skipped most often and regretted most expensively.
Request a fee for this How to start
More in Geotechnical
- On the number of boreholesFoundation investigation and recommendation