Skip to content
Acidus

Materials

Concrete cube, compressive strength

USD 22.00

Per cube. Inside scope. Curing at the laboratory is included and the seven and twenty-eight day results are both reported.

Department
Materials
Accreditation
Stated per test on the list
Reception hours
Closed, sunday

Send a sample Back to the list

Related tests materials

See everything

Before you send a sample

Search the site

Are you accredited for the test I need?
The test list says so in a column, per determination. Sixty-one are inside our ISO 17025 scope, eleven are run outside scope and marked, and eight per cent of work is subcontracted to two named laboratories. Accreditation attaches to a determination and a matrix, never to a building.
How long will it take?
The working days shown against each test are the measured median for the last twelve months rather than a target. Where a result will be late we telephone before the due date, not after it.
What is on the report?
The result, the measurement uncertainty, the limit of detection, the method reference with its revision number, the sample condition on arrival and the accreditation status of that determination. Every one of those, on every report.
How should I take the sample?
Ask us first for anything microbiological or for potable water. We supply sterile bottles free, and a badly taken sample cannot be rescued by a good laboratory no matter what it costs.

Book this test

Tell us the matrix and when you need the report. We will confirm the method before anything is run.

+1 876 923 7012

What is the matrix, and which determination do you need?